REDESIGN AND PROJECT DEVELOPMENT SCHULAU HARBOUR

Project details

In 2009, the city of Wedel designated the redevelopment area "Stadthafen Wedel" (Wedel City Harbour) in connection with the development of the banks of the Elbe River as a "Maritime Mile". The focal points of the redevelopment are the conversion of the Schulau harbour and the upgrading of the harbour surroundings with the help of a large number of individual measures. The following are some of the measures that have been and are being carried out to redesign the harbour areas in Wedel:

  • the renewal of the harbour's overall appearance, including the widening of the harbour basin by around 30 m and the shortening of the harbour.
    by around 60 m,
  • the creation of a harbour gate square through partial filling of the existing harbour basin,
  • Reduction of sediment input and improvement of sill protection through the construction of a walkable transverse breakwater,
  • Development of the harbour environment by redesigning the adjacent open spaces, including the implementation of development measures,
  • Removal of soil and silt loads,
  • Preparation of harbour area for subsequent use.

Client: City of Wedel
Total project duration: 2009 to ongoing
Total project costs: > € 20 million
Area size: approx. 15 ha (redevelopment area "Stadthafen Wedel")

BIG's share of benefits:

  • Project management for the entire project (incl. cost and contract management, participation in approval procedures, technical advice to the client)
  • Participation in the acquisition of funding (incl. preparation of the funding application, cost breakdown, review of the funding application) and funding management
  • Preparation and updating of the time schedule incl. control of the capacity framework, control of specialist planners and execution services
  • Participation in the preparation of the award and contract structure, preparation of the award documents and participation in the award of engineering and execution services
  • Participation in the preparation of the award and contract structure for the overall project, preparation of the award documents and participation in the award of engineering and execution services
  • Review of supplementary audits, preparation of and participation in acceptances
  • Preparation of a concept for explosive ordnance and safety coordination according to § 3 BaustellV in accordance with RAB 30 and TRGS 524 / DGUV-R 101-004
  • Examination of the building and plant substance incl. evaluation of the pollutant analysis and risk assessment